Onur Konteyner

Construction Site Containers

Construction site containers bring management, meetings, changing, rest and technical support functions together in an organised modular system. Floors for intensive use, easy-clean surfaces, protected electrical infrastructure and optional plumbing create a reliable working environment. Several modules can be combined side by side or stacked to follow the scale and phases of a project.

Construction Site Containers
Containers

Function and manufacturing logic

Construction site containers bring management, meetings, changing, rest and technical support functions together in an organised modular system. Floors for intensive use, easy-clean surfaces, protected electrical infrastructure and optional plumbing create a reliable working environment. Several modules can be combined side by side or stacked to follow the scale and phases of a project.

Designed for intensive site use
Expandable modular campus planning
Office, changing and social-area options
Request a Quote →
Model family

Three scales, a flexible planning approach

Drawings provide a spatial framework for early decisions. Final layouts develop from users, site, utilities and approvals.

Construction Site Containers 42 square metre model plan
Construction Site Containers

42 m² model

The 42 m² Construction Site Containers model combines an open office, meeting room and WC in a balanced circulation plan for a compact requirement. The drawing is indicative; door and window positions, service points, material thicknesses and equipment are approved before manufacture against the site conditions and final project.

Compare in technical table →
Construction Site Containers 84 square metre model plan
Construction Site Containers

84 m² model

The 84 m² Construction Site Containers model combines a site office, meeting room, changing room, lounge and WC in a balanced circulation plan for a mid-scale requirement. The drawing is indicative; door and window positions, service points, material thicknesses and equipment are approved before manufacture against the site conditions and final project.

Compare in technical table →
Construction Site Containers 126 square metre model plan
Construction Site Containers

126 m² model

The 126 m² Construction Site Containers model combines management, open office, meeting, changing, lounge, kitchen and WC areas in a balanced circulation plan for a high-capacity requirement. The drawing is indicative; door and window positions, service points, material thicknesses and equipment are approved before manufacture against the site conditions and final project.

Compare in technical table →
Technical comparison

Construction Site Containers model özellikleri

Review all three models side by side using equivalent technical criteria.

Important technical note: values are provided for website content and preliminary review. Structural, fire, energy, electrical and mechanical requirements must be finalised through approved project documentation before manufacture.
Technical item42 m² model84 m² model126 m² model
External dimensions6,0 × 7,0 m7,0 × 12,0 m9,0 × 14,0 m
Overall height2,60 m2,60 m2,60 m
Clear internal height2,35 m2,35 m2,35 m
Structural systemWelded steel chassis and galvanised lightweight steel superstructureWelded steel chassis and galvanised lightweight steel superstructure; reinforced inter-module connectionWelded steel chassis and galvanised lightweight steel superstructure; reinforced inter-module connection
Internal walls50 mm insulated partition panel; easy-clean surface50 mm insulated partition panel; easy-clean surface50 mm insulated partition panel; easy-clean surface
External walls50 mm insulated sandwich panel; RAL colour options50 mm insulated sandwich panel; RAL colour options50 mm insulated sandwich panel; RAL colour options
RoofGalvanised structure, trapezoidal sheet, vapour barrier and 80 mm insulation; rainwater drainageGalvanised structure, trapezoidal sheet, vapour barrier and 80 mm insulation; rainwater drainageGalvanised structure, trapezoidal sheet, vapour barrier and 80 mm insulation; rainwater drainage
External door900 × 2100 mm insulated steel external door900 × 2100 mm insulated steel external door900 × 2100 mm insulated steel external door
Internal doorsLaminated internal doors; moisture-resistant doors in wet areasLaminated internal doors; moisture-resistant doors in wet areasLaminated internal doors; moisture-resistant doors in wet areas
WindowsPVC/aluminium frames, 4+12+4 double glazingPVC/aluminium frames, 4+12+4 double glazingPVC/aluminium frames, 4+12+4 double glazing
FloorHeavy-duty steel subframe, cement board and commercial PVCHeavy-duty steel subframe, cement board and commercial PVCHeavy-duty steel subframe, cement board and commercial PVC
ElectricalRCD-protected distribution board, LED lighting, socket circuit and earthingRCD-protected distribution board, LED lighting, socket circuit and earthingRCD-protected distribution board, LED lighting, socket circuit and earthing
PlumbingFresh and waste water services to project; tested connections preparedFresh and waste water services to project; tested connections preparedFresh and waste water services to project; tested connections prepared
Insulation50 mm wall and 80 mm roof insulation; can be increased for the climate zone50 mm wall and 80 mm roof insulation; can be increased for the climate zone50 mm wall and 80 mm roof insulation; can be increased for the climate zone
Frequently asked

Construction Site Containers

Essential answers for the first technical conversation.

What uses suit the Construction Site Containers?

Construction site containers bring management, meetings, changing, rest and technical support functions together in an organised modular system. Floors for intensive use, easy-clean surfaces, protected electrical infrastructure and optional plumbing create a reliable working environment. Several modules can be combined side by side or stacked to follow the scale and phases of a project. Final suitability is established through a technical review of users and site conditions.

Can the standard plan be changed?

Yes. The layout, doors, windows and equipment may be adapted after structure, fire, energy, services and manufacturing constraints are checked together.

What is the lead time?

Lead time depends on quantity, model, customisation, approvals, materials, production capacity, transport and site readiness and is confirmed at proposal stage.

Is installation included in the price?

Manufacture, transport, lifting, installation, foundations and utility responsibilities should each be stated in the proposal scope.

Related products

Compare relevant alternatives

Products that address related functions through different manufacturing, logistics or architectural strengths.

ContainerOffice Container product view

Office Container

An office container creates a comfortable, professional workplace in a short lead time. Open work areas, executive rooms, meeting spaces, kitchenettes and WCs can be combined according to the operational brief. Generous window options and effective thermal and acoustic insulation support productive year-round use.

  • 21 m²
  • 42 m²
  • 84 m²
Explore Product →
ContainerDormitory Container product view

Dormitory Container

Dormitory containers establish safe, orderly and scalable personnel accommodation. Bedrooms, corridors, lockers, shower and WC areas and lounges can be planned around the required capacity. Ventilation, insulation, fire-safety planning and easy-clean interior surfaces support comfortable long-term operation.

  • 42 m²
  • 84 m²
  • 126 m²
Explore Product →
ContainerModular Dining Hall product view

Modular Dining Hall

A modular dining hall separates dining, preparation, cooking, washing, dry and cold storage and service routes in a hygiene-led plan. Slip-resistant floors, washable panel surfaces, powerful ventilation and service points compatible with professional kitchen equipment are available. The system can scale from small teams to high-capacity construction campuses.

  • 84 m²
  • 252 m²
  • 346 m²
Explore Product →

Let’s define the right solution together.

Share the function, capacity, site conditions and budget; we will shape the right standard or premium response.

Start Your Enquiry